Nissan Primera P12. Manual — part 624
MT-2
Clearance Between Baulk Ring and Gear . . . .. 61
3RD, 4TH, 5TH, 6TH & REVERSE BAULK RING... 61
1ST AND 2ND DOUBLE BAULK RING . . . ... 61
Available Snap Rings . . . . . . . . . . . .. 61
6TH BUSHING . . . . . . . . . . . . . 61
Available C-rings . . . . . . . . . . . . . . 62
MAINSHAFT C-RING . . . . . . . . . . .. 62
Available Thrust Washer . . . . . . . . . . . 62
INPUT SHAFT THRUST WASHER . . . . . . 62
DIFFERENTIALSIDEGEARTHRUSTWASHER
Available Adjusting Shims . . . . . . . . . .. 63
MAINSHAFT ADJUSTING SHIM . . . . . . .63
INPUT SHAFT REAR BEARING ADJUSTING
SHIM . . . . . . . . . . . . . . . . . 63
MAINSHAFT REAR BEARING ADJUSTING
SHIM . . . . . . . . . . . . . . . . . 63
REVERSE IDLER GEAR ADJUSTING SHIM . ..63
6TH MAIN GEAR ADJUSTING SHIM . . . . ..64
PRECAUTIONS
MT-3
[RS6F51R]
D
E
F
G
H
I
J
K
L
M
A
B
MT
[RS6F51R]
PRECAUTIONS
PFP:00001
Caution
ECS00ABB
●
If manual transaxle is removed from the vehicle, always replace CSC (concentric slave cylinder). CSC
insert is returned to original position to remove transaxle. Dust on clutch disc sliding parts may damage
CSC seal and may cause clutch fluid leak.
●
Do not reuse transaxle oil, once it has been drained.
●
Check oil level or replace oil with vehicle on level ground.
●
During removal or installation, keep inside of transaxle clear of dust or dirt.
●
Check for the correct installation status prior to removal or disassembly. If mating marks are required, be
certain they do not interfere with the function of the parts they are applied to.
●
In principle, tighten bolts or nuts gradually in several steps working diagonally from inside to outside. If
tightening sequence is specified, observe it.
●
Be careful not to damage sliding surfaces and mating surfaces.
MT-4
[RS6F51R]
PREPARATION
PREPARATION
PFP:00002
Special Service Tools
ECS00ABC
Tool number
Tool name
Description
KV381054S0
Puller
●
Side bearing outer race removal
●
Mainshaft front bearing removal
ST35321000
Drift
a: 49 mm (1.93 in) dia.
b: 41 mm (1.61 in) dia.
●
Input shaft oil seal installation
●
Reverse main gear installation
●
1st bushing installation
●
1st-2nd synchronizer hub installation
●
2nd bushing installation
●
3rd main gear installation
ST30720000
Drift
a: 77 mm (3.03 in) dia.
b: 55.5 mm (2.185 in) dia.
●
Differential oil seal installation
●
Differential side bearing outer race
installation
●
Mainshaft rear bearing installation
●
Differential side bearing installation
ST33200000
Drift
a: 60 mm (2.36 in) dia.
b: 44.5 mm (1.752 in) dia.
●
Mainshaft front bearing installation
●
6th bushing installation
●
4th main gear installation
●
5th main gear installation
●
6th main gear installation
ST33061000
Drift
a: 38 mm (1.50 in) dia.
b: 28.5 mm (1.122 in) dia.
●
Bore plug installation
●
Differential side bearing removal
ST33052000
Drift
a: 22 mm (0.87 in) dia.
b: 28 mm (1.10 in) dia.
●
Welch plug installation
●
Input shaft rear bearing removal
●
5th bushing, thrust washer, 4th input gear,
4th gear bushing, 3rd-4th synchronizer hub
and 3rd input gear removal
●
Input shaft front bearing installation
●
6th input gear and 6th bushing removal
●
Mainshaft rear bearing removal
●
4th main gear and 5th main gear removal
●
6th main gear removal
ZZA0601D
ZZA1000D
ZZA0811D
ZZA1002D
ZZA1000D
ZZA1023D
PREPARATION
MT-5
[RS6F51R]
D
E
F
G
H
I
J
K
L
M
A
B
MT
KV40105020
Drift
a: 39.7 mm (1.563 in) dia.
b: 35 mm (1.38 in) dia.
c: 15 mm (0.59 in)
●
5th input gear and synchronizer hub
removal
●
3rd main gear, 2nd main gear, 2nd bushing,
1st-2nd synchronizer hub, 1st main gear,
reverse main gear and 1st bushing removal
KV40105710
Press stand
a: 46 mm (1.81 in) dia.
b: 41 mm (1.61 in)
●
3rd-4th synchronizer hub installation
●
4th bushing installation
●
5th busing installation
●
5th-6th synchronizer hub installation
●
2nd bushing installation
●
3rd main gear installation
ST38220000
Press stand
a: 63 mm (2.48 in) dia.
b: 65 mm (2.56 in)
●
Reverse main gear installation
●
1st bushing installation
●
1st-2nd synchronizer hub installation
ST30032000
Drift
a: 80 mm (3.15 in) dia.
b: 38 mm (1.50 in) dia.
c: 31 mm (1.22 in) dia.
●
Input shaft front bearing installation
ST30901000
Drift
a: 79 mm (3.11 in) dia.
b: 45 mm (1.77 in) dia.
c: 35.2 mm (1.386 in) dia.
●
Input shaft rear bearing installation
●
4th main gear installation
●
5th main gear installation
●
6th main gear installation
●
Mainshaft rear bearing installation
ST30031000
Puller
●
Measuring wear of 1st and 2nd baulk ring
KV40101630
Drift
a: 68 mm (2.68 in) dia.
b: 60 mm (2.36 in) dia.
●
Reverse main gear installation
Tool number
Tool name
Description
ZZA1133D
ZZA1058D
ZZA1058D
ZZA0978D
ZZA0978D
ZZA0537D
ZZA1003D
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст